Xx see the recommendations on page 20 before installing allura fiber cement siding over structural insulated panels thicker than 1.
Allura siding installation.
Xxinstall individual shakes over wall construction with framing spaced no more than 24 o c.
Allura fiber cement siding installation manualconcrete masonry cmu or poured concrete wallsconsult applicable building codes before installing allura fiber cement siding on cmu or a concrete wall the cmu or concrete wall must be able to resist all loads transferred from the siding.
Then you would install your fiber cement corner and window trim.
Use galvanized siding nails and make sure that the nails penetrate a minimum of 1 1 4 inches into the framing.
Xx apply siding over a weather resistant barrier in.
Allura fiber cement siding is tested in accordance with astm1186 in the u s.
Xxsee the recommendations on page 20 before installing allura fiber cement siding over structural insulated panels thicker than 1.
Do not overdrive the nails.
With 10 gorgeous new colors and 1 new stain our outstanding color palette has now extended to 30 total colors.
And a minimum of 7 16 osb or 1 2 plywood sheathing.
Position your first course of siding inch below the starter strip and nail the siding into the studs 1 inch down from the top of the siding.
And a minimum of 7 16 osb or 1 2 plywood sheathing.
And ccmc technical guide requirements as required by the national building code of canada.